Understanding the Costs of Land Development in Texas: City vs. County Approvals
- Chelsea
- Mar 25
- 3 min read
Land development in Texas offers exciting opportunities, but it comes with various costs and regulatory hurdles. Whether you're developing in a city or a county, the approval processes and associated expenses can differ significantly. Understanding these costs upfront can help you plan strategically, avoid delays, and maximize your investment.
Key Costs Associated with Land Development in Texas
1️⃣ Land Acquisition Costs
The purchase price of raw land varies based on location, zoning, and accessibility. Rural properties and county land are generally more affordable, while urban properties or those in high-growth areas come at a premium.

2️⃣ Site Preparation & Infrastructure
Clearing & Grading – Costs depend on the size of the land and environmental constraints.
Utilities Installation – Connecting to city water, sewer, and electricity often costs more in urban areas, whereas rural properties may require private wells and septic systems.
Drainage Systems – Compliance with local and state regulations adds additional costs for stormwater management.
3️⃣ Permitting & Zoning Fees
Cities and counties require different permits, each with associated costs:
City Approvals & Costs
Developing within city limits involves a more structured approval process, often requiring:
✔ Zoning & Land Use Permits – Rezoning requests, special use permits, and variance applications can range from $500 to $5,000, depending on the municipality.
✔ Site Development Permits – Cities require detailed engineering and design approvals, costing between $2,000 and $15,000.
✔ Impact Fees – These fees fund public infrastructure like roads and utilities and can add $5,000 to $25,000+ per acre, depending on the city.
✔ Building Permits – Required for any structures, with costs based on square footage and valuation.

County Approvals & Costs
Counties generally have fewer regulations than cities, but development approvals still involve:
✔ Subdivision Approvals – If dividing land into multiple lots, counties require plat approvals, which can cost $1,000 to $10,000.
✔ Septic & Well Permits – Rural properties without city utilities require private systems, adding $5,000 to $15,000 for installation.
✔ Road & Access Permits – County roads may require access permits, costing $500 to $5,000, depending on road classifications.
4️⃣ Engineering & Design Costs
Proper site planning ensures compliance with zoning, drainage, and utility requirements. Hiring professional land planners and engineers can range from $10,000 to $100,000, depending on project complexity.

5️⃣ Environmental & Impact Studies
Floodplain Analysis – Required for developments near flood-prone areas, costing $3,000 to $10,000.
Traffic Impact Analysis – Required for larger developments, ranging from $5,000 to $50,000.
Environmental Site Assessments – May be needed for wetlands, endangered species, or soil testing, adding $2,000 to $15,000.

6️⃣ Construction & Infrastructure Development
Roads & Sidewalks – City regulations may require curb, gutter, and sidewalks, costing $100,000+ per mile.
Stormwater Management – Installing detention ponds or drainage systems adds $10,000 to $100,000, depending on requirements.
Utility Extensions – Bringing city utilities to a site can cost $20,000 to $200,000+, depending on distance and availability.
7️⃣ Financing & Holding Costs
Land development doesn’t happen overnight, and holding costs add up:
Interest on Loans – Development loans may carry rates of 5-10% annually.
Property Taxes – County properties may have lower tax rates than city properties, but undeveloped land still incurs taxes.
Maintenance Costs – Mowing, erosion control, and security can add thousands per year.
City vs. County Development: Which Is More Cost-Effective?
Cost Factor | City Development | County Development |
Zoning & Permitting Fees | Higher (more regulations) | Lower (fewer approvals) |
Infrastructure Requirements | Strict (sidewalks, roads, utilities) | Flexible (private wells, septic) |
Impact Fees | High (funding public infrastructure) | Lower (fewer services provided) |
Approval Timelines | Longer (6-12 months) | Faster (3-6 months) |
Utility Costs | Expensive (city water/sewer hookups) | Private well/septic costs |
Development Restrictions | More zoning & density regulations | Fewer restrictions, but access may be limited |
Planning for Success in Texas Land Development
Whether you’re developing in a city or county, understanding the costs upfront is crucial to avoiding unexpected delays and budget overruns. A well-planned project accounts for zoning, permitting, and infrastructure needs to maximize land value and minimize risks.
Let’s Plan Your Development the Right Way
We specialize in navigating the complexities of Texas land development. Whether you need feasibility studies, permitting assistance, or strategic planning, we’ve got the expertise to help. Contact us today to discuss your project!
###
Hutson Land Planners & Development Consultants, LLC provides expert guidance in land planning, right-of-way acquisitions, and real estate litigation support across Texas. With decades of experience, we help landowners, developers, and municipalities navigate complex land use challenges with smart strategies and proven results. Need expert advice on your next project? Contact us today and let’s build something great together!